Common challenges encountered

The storage and computing requirements supported by data centres present new challenges to connectivity within the data centre, in terms of bandwidth, transmission distance, power consumption and cost.

Network Bandwidth Problem

As data centre business is rapidly growing, there is an urgent need to upgrade bandwidth and build new data centre networks.

High Power Consumption

High power consumption affects heat dissipation, reliability, and increases overall heat dissipation pressure.

Limited Budget

Migrating to high-density data centres increases the maintenance cost in the later stage, which increases the operating cost.

400G Data Centre

Key Benefits

Artboard 1 copy 3@0.5x

High Density

Deploying QSFPDD modules in high density increases transmission capacity. Provide seamless upgrade from 100G to 400G.

Artboard 1@0.5x

Low Power Consumption

Improve product reliability by using smaller DSP chips. DDM helps customers simplify network operation and maintenance.

Artboard 1 copy@0.5x

Flexible Deployment

Connect new 400G sites to legacy 100G sites via 4x100G breakout. Upgrade based on existing infrastructure to save costs.

Product Specification

Solution Support

Please enable JavaScript in your browser to complete this form.
Name

Solution & Benefits

High-definition display

4K ultra-clear display, long-term viewing does not hurt the eyes, and high touch sensitivity to meet the teacher's daily writing.

Excellent classroom experience

Through the 4K video all-in-one machine, remote students can also integrate into the classroom and enjoy fair and equal educational rights.

Convenient management

The audio and video all-in-one machine is a USB device, which only needs to be connected to the power supply, and there are basically no additional maintenance costs.