Common challenges encountered
The storage and computing requirements supported by data centres present new challenges to connectivity within the data centre, in terms of bandwidth, transmission distance, power consumption and cost.
Network Bandwidth Problem
As data centre business is rapidly growing, there is an urgent need to upgrade bandwidth and build new data centre networks.
High Power Consumption
High power consumption affects heat dissipation, reliability, and increases overall heat dissipation pressure.
Limited Budget
Migrating to high-density data centres increases the maintenance cost in the later stage, which increases the operating cost.
400G Data Centre
Key Benefits
High Density
Deploying QSFPDD modules in high density increases transmission capacity. Provide seamless upgrade from 100G to 400G.
Low Power Consumption
Improve product reliability by using smaller DSP chips. DDM helps customers simplify network operation and maintenance.
Flexible Deployment
Connect new 400G sites to legacy 100G sites via 4x100G breakout. Upgrade based on existing infrastructure to save costs.
Product Specification
Solution Support
Solution & Benefits
High-definition display
4K ultra-clear display, long-term viewing does not hurt the eyes, and high touch sensitivity to meet the teacher's daily writing.
Excellent classroom experience
Through the 4K video all-in-one machine, remote students can also integrate into the classroom and enjoy fair and equal educational rights.
Convenient management
The audio and video all-in-one machine is a USB device, which only needs to be connected to the power supply, and there are basically no additional maintenance costs.